OIL PUMP > INSTALLATION

for Preparation Click here



1. INSTALL TIMING CHAIN COVER OIL SEAL


    A209564E01
  1. Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing chain cover edge.

    SST
    09950-60010   (09951-00250, 09951-00410, 09952-06010)
    09950-70010   (09951-07150)

    Oil seal tap in depth:
    -0.5 to 1.0 mm (-0.0197 to 0.0394 in.)

    NOTICE:
    Do not tap the oil seal at an angle.

  1. Apply a light coat of MP grease to the timing chain cover oil seal lip.

    NOTICE:
    Keep the seal lip free of foreign matter.



2. INSTALL NO. 2 WATER INLET HOUSING GASKET
  1. Install a new gasket to the water inlet.



3. INSTALL WATER INLET


A217326E01
  1. Temporarily install the water inlet with the 3 bolts.

  1. Fully tighten the 3 bolts in the order shown in the illustration.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



4. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY


    A201138E02
  1. Apply adhesive to 2 or 3 threads of the plug.
    Text in Illustration 
    *1
    Adhesive

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. Using an 8 mm socket hexagon wrench, install the plug.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    NOTICE:
    1. Install the plug within 3 minutes after applying adhesive.
    2. Do not start the engine within 1 hour after installation.

  1. Remove any old packing material remaining on the sealing surfaces before applying seal packing.



  1. Clean and degrease the contact surfaces of the timing chain cover, camshaft housing, cylinder head, cylinder block, and oil pan and confirm that no oil, moisture, or other foreign matter remains on the surfaces.


    A217349E01


    Text in Illustration 
    *a
    Clean and degrease
    -
    -



    A217341
  1. Install 2 new O-rings.



  1. Apply seal packing to the timing chain cover as shown in the following illustration.


    A199187E03


    Text in Illustration 
    *a
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
    *b
    Toyota Genuine Seal Packing Black 1282B, Three Bond 1282B or equivalent

    NOTICE:
    1. When there is oil on contact surfaces, wipe them with oil-free cloth before applying seal packing.
    2. Install the chain cover within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.

    HINT:
    Areas A - A and B - B are the joints between the cylinder block and oil pan, cylinder block and cylinder head, and cylinder head and camshaft housing.


    Seal Packing Application Chart:

    Area
    Seal Packing Diameter
    Seal Packing
    Continuous Line Area
    Except A - A and B - B
    3.5 to 4.5 mm (0.138 to 0.177 in.)
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
    Dashed Line Area
    2.0 to 3.0 mm (0.0787 to 0.118 in.)
    Toyota Genuine Seal Packing Black 1282B, Three Bond 1282B or equivalent



    A217350
  1. Align the oil pump drive rotor spline and the crankshaft as shown in the illustration. Install the chain cover to the crankshaft.



    A217338E01
  1. Temporarily install the engine mounting bracket RH with the 3 bolts.

    Bolt Length:
    Item
    Length
    Bolt A
    80 mm (3.150 in.)
    Bolt B
    40 mm (1.575 in.)



    A217337E01
  1. Temporarily install the water pump and a new water pump gasket to the timing chain cover with the 5 bolts.

    Bolt Length:
    Item
    Length
    Bolt A
    40 mm (1.575 in.)
    Bolt B
    40 mm (1.575 in.)
    Bolt F
    18 mm (0.709 in.)

  1. Fully tighten the 2 F bolts shown in the illustration.

    Torque:
    Bolt F:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



  1. Temporarily tighten the timing chain cover with the 21 bolts and a new seal washer.


    A217351E01


    Text in Illustration 
    *1
    Seal Washer
    -
    -

    HINT:
    1. Apply adhesive to the threads of bolt E.
    2. Apply adhesive to bolt E more than 7.0 mm (0.275 in.) from the bolt tip.

    Bolt E:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    Bolt Length:
    Item
    Length
    Bolt A
    40 mm (1.575 in.)
    Bolt B
    40 mm (1.575 in.)
    Bolt C
    35 mm (1.378 in.)
    Bolt D, E
    25 mm (0.984 in.)

  1. Fully tighten the timing chain cover with the 27 bolts as shown in the illustration.

    Torque:
    Bolt A:
    71 N*m{ 724 kgf*cm , 52 ft.*lbf }
    Bolt B, D, E:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }
    Bolt C:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



5. INSTALL CRANKSHAFT PULLEY ASSEMBLY


    A217316E01
  1. Align the pulley set key with the key groove of the crankshaft pulley, and then slide on the crankshaft pulley.

  1. Using SST, install the crankshaft pulley bolt.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    128 N*m{ 1305 kgf*cm , 94 ft.*lbf }



6. INSTALL WATER PUMP PULLEY


A217314E01
SST
09960-10010   (09962-01000, 09963-00600)
  1. Using SST, install the water pump pulley with the 4 bolts.

    SST
    09960-10010   (09963-00600)

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



7. INSTALL CRANKSHAFT POSITION SENSOR


    A198002
  1. Apply a light coat of engine oil to the O-ring of the sensor.



    A217325
  1. Install the crankshaft position sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



8. INSTALL CAMSHAFT BEARING CAP OIL HOLE GASKET


    A197590
  1. Install the 2 new camshaft bearing cap oil hole gaskets to the No. 1 camshaft bearing cap.



9. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


    A217324
  1. Install a new gasket to the cylinder head cover.

    NOTICE:
    Remove any oil from the contact surfaces.



    A198006E03
  1. Apply seal packing as shown the illustration.
    Text in Illustration 
    *1
    Seal Packing
    *a
    Bead Diameter

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Bead diameter:
    2.0 mm (0.0787 in.)

    NOTICE:
    1. Remove any oil from the contact surfaces.
    2. Install the cylinder head cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after the installation.



    A217323E01
  1. Temporarily install the cylinder head cover with 2 new seal washers and the 18 bolts.
    Text in Illustration 
    *1
    Seal Washer



    A197631
  1. Apply a light coat of engine oil to the O-rings of the No. 1 crankshaft position sensors.



    A217320
  1. Temporarily install the 2 No. 1 crankshaft position sensors with the 2 bolts.



    A209549E01
  1. Fully tighten the 20 bolts in the order shown in the illustration.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



10. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
  1. Install the V-ribbed belt tensioner with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



11. INSTALL NO. 2 IDLE PULLEY ASSEMBLY (w/ Air Conditioning System)


A217372E01
  1. Temporarily install the No. 2 idle pulley with the 4 bolts.

  1. Fully tighten the 4 bolts in the order shown in the illustration.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }



12. INSTALL NO. 1 WATER BY-PASS PIPE


A217313E01
  1. Connect the water by-pass hose to the water inlet with the clip.
    Text in Illustration 
    *1
    Water By-Pass Hose
    *2
    No. 1 water by-pass pipe
    *3
    No. 2 Water By-Pass Hose
    *4
    Protector
    *5
    Clip

    NOTICE:
    Install the clip so that its claws face away from the engine.

  1. Temporarily install the No. 1 water by-pass pipe with the 3 bolts.

  1. Fully tighten the 3 bolts in the order shown in the illustration.

    Torque:
    22 N*m{ 224 kgf*cm , 16 ft.*lbf }

  1. Engage the No. 2 water by-pass hose to the 3 clamps as shown in the illustration.



13. INSTALL NO. 2 VENTILATION HOSE


A217369E01
  1. Install the ventilation hose to the cylinder head with the clip.
    Text in Illustration 
    *a
    View A
    *b
    Upper
    *c
    Clip center installation range
    *d
    Paint mark of the hose

    NOTICE:
    1. Install the clip so that its claws are within the clip center installation range.
    2. The protrusion of the head cover should overlap the paint mark of the hose.



14. INSTALL VENTILATION HOSE


A217311E01
  1. Install the ventilation hose to the cylinder head with the clip.
    Text in Illustration 
    *a
    View A
    *b
    Left
    *c
    Rear
    *d
    Clip center installation range

    NOTICE:
    Install the clip so that its claws are within the clip center installation range.



15. INSTALL NO. 1 IGNITION COIL
  1. Install the 4 ignition coils with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



16. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Install a new O-ring to the oil level dipstick guide.

    HINT:
    Apply engine oil to the O-ring and install the oil level dipstick guide into the oil pan.



    A217307E01
  1. Temporarily install the engine oil level dipstick guide with the 2 bolts.

  1. Fully tighten the 2 bolts in the order shown in the illustration.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



17. INSTALL ENGINE OIL LEVEL DIPSTICK


18. INSTALL NO. 4 ENGINE WIRE
  1. Engage the 7 clamps and install the No. 4 engine wire.

  1. Install the ground bolt.

    Torque:
    8.4 N*m{ 86 kgf*cm , 74 in.*lbf }

  1. Connect the 4 fuel injector connectors.

  1. Connect the 4 ignition coil connectors.

  1. Connect the 2 camshaft timing oil control valve connectors.



19. INSTALL INTAKE MANIFOLD ASSEMBLY
  1. Install a new No. 2 intake manifold to head gasket onto the cylinder head.

  1. Install the EGR delivery chamber onto the No. 2 intake manifold to head gasket.

  1. Install a new intake manifold to head gasket onto the EGR delivery chamber.



    A217306E01
  1. Temporarily install the intake manifold with the 5 bolts and 2 nuts.

  1. Fully tighten the 5 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



20. INSTALL EGR PIPE CONNECTOR
  1. Install 2 new EGR pipe gaskets onto the intake manifold and the EGR valve.



    A217298E01
  1. Temporarily install the EGR pipe connector with the 4 nuts.

  1. Fully tighten the A nuts first, and then tighten nut B.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



21. INSTALL INTAKE MANIFOLD STAY


A217305E01
  1. Temporarily install the intake manifold stay with the 2 bolts.

  1. Fully tighten the 2 bolts in the order shown in the illustration.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



22. CONNECT NO. 4 WATER BY-PASS HOSE


A217300E01
  1. Connect the No. 4 water by-pass hose to the EGR valve with the clip.
    Text in Illustration 
    *a
    View A
    *b
    Upper
    *c
    Clip center installation range

    NOTICE:
    Install the clip so that its claws are within the clip center installation range.



23. CONNECT NO. 2 WATER BY-PASS HOSE


A217304E01
  1. Connect the No. 2 water by-pass hose to the throttle body with the clip.
    Text in Illustration 
    *a
    View A
    *b
    Upper
    *c
    Clip installation range
    *d
    Paint mark of the hose

    NOTICE:
    1. Install the clip so that its claws are within the clip installation range.
    2. Line up the rib of the throttle with motor body assembly with the center of the paint mark.



24. CONNECT VENTILATION HOSE


A217302E01
  1. Connect the ventilation hose to the intake manifold with the clip.
    Text in Illustration 
    *a
    View A
    *b
    Upper
    *c
    Left
    *d
    Clip center installation range

    NOTICE:
    Install the clip so that its claws are within the clip center installation range.



25. INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY
  1. Install the new exhaust manifold to head gasket and the new inlet EGR gasket onto the cylinder head.



    A217297E01
  1. Temporarily install the exhaust manifold converter with the 3 bolts and 4 nuts.

  1. Fully tighten the 3 bolts and 4 nuts in the order shown in the illustration.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



26. INSTALL MANIFOLD STAY


A217296E01
  1. Temporarily install the manifold stay with the bolt and nut.

  1. Fully tighten the bolt and nut in the order shown in the illustration.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



27. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR


A217295E01
  1. Temporarily install the exhaust manifold heat insulator with the bolt and 2 nuts.

  1. Fully tighten the bolt and 2 nuts in the order shown in the illustration.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



28. INSTALL GENERATOR ASSEMBLY


A217371E01
  1. Install the generator with the 2 bolts.

    Torque:
    Bolt A:
    54 N*m{ 551 kgf*cm , 40 ft.*lbf }
    Bolt B:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



29. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
  1. Install the engine assembly with transaxle (Click here).